ETI 1 |
Year of construction |
1975 |
1984 |
Year of renovation |
1997 |
1997 |
Total floor area |
30500 m² |
14500 m² |
Hours of operation offices |
12 |
12 |
Hours of operation labs |
up to 24 |
up to 24 |
|
University buildings normally use very sophisticated HVAC systems. These systems have to be
adapted to the actual user needs quite frequently. If this is not done on a regular basis energy consumption becomes quite heavy. The adaptation
of the systems can be financed through third party contracting. The renovation of the HVAC system of two buildings of the University of
Stuttgart provides an impressive example.
Retrofit features:
The project concentrated only on the technical systems. No retrofit of the building envelope was undertaken.
Thus the financing could be achieved completely on the base of performance contracting.
|
|